Customization: | Available |
---|---|
After-sales Service: | Sent to Spare Parts |
Warranty: | 1 Years or 1000 Hours |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Genset Model | KT-C110(S) |
Prime power (50Hz) | 80KW/100KVA |
Standby power (50Hz) | 88KW/110KVA |
Frequency/Speed | 50Hz/1500rpm |
Voltage | 400/230V |
Phase | Three phase, four wires |
Manufacturer | KATE POWER |
Engine model | C 6BT5.9-G2 |
Controller model | Smartgen HGM6120 |
ENGINE DATA | |
Manufacture | C Engine Company Ltd. |
Picture | |
Model | 6BT5.9-G2 |
Engine speed | 1500rpm |
Engine power (Net) | 100KW |
Engine power (Gross) | 110KW |
Number of cylinders | 4 |
Cylinder arrangement | Vertical in-line |
Cycle | 4-troke |
Aspiration | Turbocharged & Aftercooled |
Combustion system | Direct injection |
Compression ratio | 16.6:1 |
Bore and Stroke | 102 x 120mm |
Displacement | 5.9 liters |
Fuel system | PB pump_GAC governor /BYC |
Cooling system | Water cooled |
Speed-droop | 1% |
Starting system | DC24V |
FUEL CONSUMPTION | ||
Engine speed | Fuel consumption | |
g/kw.h | L/H | |
Standby power | ||
Prime power | 235 | 28.5 |
75% of prime power | ||
50% of prime power |
ALTERNATOR DATA | |
Manufacture | |
Picture | |
Model | UCI224G |
Output power | 80KW/ 100KVA |
AVR model | SX460 |
Number of phase | 3 |
Power factor (Cos Phi) | 0.8 |
Altitude | ≤1000m |
Over speed | 2250RPM |
Number of pole | 4 |
Exciter type | Shunt |
Insulation class | H |
Voltage regulation | ±0.5% |
Sustained short circuit current | 300% (3 IN): 10s |
Total harmonics (TGH/THC) | <4% |
Wave form: NEMA = TIF | <50 |
Wave form: I.E.C = THF | <2% |
Bearing | Single |
Coupling | Direct |
Exhaust silencer | Flexible pipes | Flange | Base frame | Main circuit breaker |
Starting battery | Battery wires | Battery charger | Float battery charger | AVR |
Cooling radiator | Wires diagram | Manual books | Auto control panel | Silent canopy |
Engine & Radiator | Alternator part | Electric part | Fuel tank part | Others |
Water preheater | PMG | ATS | External daily fuel tank | Weatherproof canopy |
Lub oil pre-heater | Anti-condensation heater | Synchronization panel | Automatic fuel pump | Mobile trailer |
Spare parts | Parallel droop | ABB breaker | Oil drain pump | Containerized |
Diesel Generator Set Specification and Configuration | ||||||||||||||
Specification 50Hz 400/230V<2> | Engine Specification | Open Sets | Soundproof Sets | |||||||||||
Genset Model<1> | Power (kVA) | Power (kW) | CONS 100% (L/h) | Engine Model | Power | Cyl. | Gov.<5> | Displace- ment (L) |
Dimension L*W*H (mm) <6> |
Weight (kg) <7> |
Dimension L*W*H (mm) |
Weight (kg) |
||
PRP<3> | ESP<4> | PRP | ESP | |||||||||||
KT-C25 | 25 | 27.5 | 20 | 22 | 7.1 | 4B3.9-G1 | 24 | 4L | M | 3.9 | 1700*750*1150 | 850 | 1950*830*1200 | 1290 |
KT-C25 | 25 | 27.5 | 20 | 22 | 6.7 | 4B3.9-G2 | 24 | 4L | E | 3.9 | 1700*750*1150 | 850 | 1950*830*1200 | 1290 |
KT-C40 | 40 | 44 | 32 | 35.2 | 10 | 4BT3.9-G1 | 36 | 4L | M | 3.9 | 1820*760*1150 | 950 | 2200*950*1200 | 1350 |
KT-C40 | 40 | 44 | 32 | 35.2 | 9.3 | 4BT3.9-G2 | 36 | 4L | E | 3.9 | 1820*760*1150 | 950 | 2200*950*1200 | 1350 |
KT-C50 | 50 | 55 | 40 | 44 | 12.9 | 4BTA3.9-G2 | 50 | 4L | E | 3.9 | 1950*830*1150 | 1050 | 2400*950*1200 | 1450 |
KT-C56 | 56 | 62 | 45 | 50 | 12.9 | 4BTA3.9-G2 | 50 | 4L | E | 3.9 | 1950*830*1150 | 1070 | 2400*950*1200 | 1470 |
KT-C60 | 60 | 66 | 48 | 52.8 | 12.9 | 4BTA3.9-G2 | 50 | 4L | E | 3.9 | 1950*830*1150 | 1100 | 2400*950*1200 | 1500 |
KT-C72 | 72.5 | 79.8 | 58 | 63.8 | 17.6 | 4BTA3.9-G11 | 70 | 4L | E | 3.9 | 2150*880*1350 | 1120 | 2700*1100*1450 | 1800 |
KT-C85 | 85 | 93.5 | 68 | 74.8 | 21.7 | 6BT5.9-G1 | 86 | 6L | M | 5.9 | 2150*880*1350 | 1150 | 2700*1100*1450 | 1850 |
KT-C85 | 85 | 93.5 | 68 | 74.8 | 22 | 6BT5.9-G2 | 86 | 6L | E | 5.9 | 2150*880*1350 | 1150 | 2700*1100*1450 | 1850 |
KT-C100 | 100 | 110 | 80 | 88 | 21.7 | 6BT5.9-G1 | 86 | 6L | M | 5.9 | 2150*880*1400 | 1150 | 2700*1100*1450 | 1900 |
KT-C100 | 100 | 110 | 80 | 88 | 22 | 6BT5.9-G2 | 86 | 6L | E | 5.9 | 2150*880*1350 | 1150 | 2700*1100*1450 | 1900 |
KT-C120 | 120 | 132 | 96 | 105.6 | 27 | 6BTA5.9-G2 | 106 | 6L | E | 5.9 | 2350*950*1360 | 1200 | 2700*1100*1450 | 2000 |
KT-C140 | 140 | 154 | 112 | 123.2 | 34 | 6BTAA5.9-G2 | 120 | 6L | E | 5.9 | 2350*950*1360 | 1400 | 2800*1150*1560 | 2150 |
KT-C160 | 160 | 176 | 128 | 140.8 | 42 | 6CTA8.3-G2 | 163 | 6L | E | 8.3 | 2470*950*1430 | 1900 | 3100*1100*1560 | 2350 |
KT-C200 | 200 | 220 | 160 | 176 | 45 | 6CTAA8.3-G2 | 183 | 6L | E | 8.3 | 2600*980*1450 | 2300 | 3300*1150*1800 | 2550 |
KT-C230 | 230 | 253 | 184 | 202.4 | 53 | 6LTAA8.9-G2 | 220 | 6L | E | 8.9 | 2600*1000*1450 | 2400 | 3300*1150*1800 | 2700 |
KT-C250 | 250 | 275 | 200 | 220 | 53 | 6LTAA8.9-G2 | 220 | 6L | E | 8.9 | 2600*1000*1450 | 2500 | 3400*1200*1900 | 2750 |
Brand: KATE
Our vision: To be a global Emergency Power expert
Business type:
Power generation equipment manufacturer and service provider
Power plant solutions provider
Products and service:
Diesel Generator Sets, Gas Generator Sets, Power Equipment
Accessories and Spare Parts
People:150
Website: http://katepower.en.made-in-china.com
Professional power assistantΔ FAQ (FREQUENCY ASKED QUESTION)
Question: What's your warranty period?
Answer: Our payment terms is 1 year or 1000 running hours whichever comes first. But based on some special project, we can extended our warranty period.
Question: Does your generators has global warranty?
Answer: Yes, most of our products like generator enjoy the global warranty service. And the alternator we use like Leroysomer,marathon also enjoy the global warranty service, so you do not need to worry about the aftersales service.
Question: Do you accept OEM/ODM service?
Answer: Yes, we can accept OEM.
Question: What's your payment terms?
Answer: We can accept T/T 30% in advance, and the balance 70% shall be paid before shipment or L/C at sight, L/C deferred payment terms or west union.
Question: What's your delivery time?
Answer: Our normal delivery time is 25 working days. But if your order is some special engine and alternator, then the delivery time is longer.